© 2010 steve DSC01890

Tile work finished on the outdoor bar

We finished up the tile work on the bar this past weekend. The grouting was a bit tedious with the slate tile as it wanted to get into every irregularity on the tiles. Overall we’re pretty pleased with the tile. In addition to the tile, we also moved the bar into its final place and finished up the electrical work. All that remains is all the wood work on the sides and trim.

Check out more pictures here:  Outdoor bar project pictures